28.8.2024

Building Act brings new climate requirements for construction

The new Building Act will enter into force on 1 January 2025 and replace the Land Use and Building Act currently in force for the parts concerning construction. 

In accordance with the current government programme, certain parts of the Building Act are still to be amended before the Act enters into force to ease the administrative burden and reduce bureaucracy. The draft government proposal was circulated for comments in early 2024, and the Government intends to submit the proposal for amending the Building Act to Parliament in September 2024. However, the Ministry of the Environment already notified the EU on the government proposal on amending the Building Act in June 2024.

This blog is the second part of our blog series focusing on the new Building Act. Here you can find the first part, in which we discussed changes in building permits. This part focuses on one of the key changes in the Building Act, i.e. incorporating climate change mitigation into building legislation.

New essential technical requirements concerning low carbon buildings and carbon footprint thresholds

In future, certain buildings will have to meet new essential technical requirements for low-carbon buildings and carbon footprint thresholds. In the already adopted Building Act, these essential technical requirements are grouped under the same section into a single essential technical requirement. However, if the planned amendments to the Building Act are adopted, there will be two separate, strongly interacting, essential technical requirements.

The essential technical requirement for a low-carbon building requires the developer to ensure that the new building is designed and constructed to be low-carbon in a manner required by its intended use. The carbon footprint and carbon handprint of the building and site must also be reported in a climate report with respect to certain new buildings. In addition, if the planned amendments to the Building Act are adopted, the essential technical requirement for low-carbon buildings will also require that a list of building products is drawn up for certain new buildings. The essential technical requirement on carbon footprint states that the carbon footprint of new buildings must not exceed the carbon footprint threshold set for each category of purpose of use.

According to the already adopted Building Act, the requirements are to enter into force on 1 January 2025, but if the Building Act is amended as planned, the requirements will not enter into force until 1 January 2026.

Climate report will be required for many new building projects

The purpose of the climate report is to provide information on the carbon footprint of the building, which is the total amount of greenhouse gases emitted during the lifecycle of the building, and the carbon handprint, which refers to such factors outside the lifecycle that affect the net climate benefits and that would not occur without the project.

If the planned amendments to the Building Act are adopted, the obligation to prepare a climate report will be reduced compared to the already adopted Building Act, so that a climate report should only be prepared for the following new buildings: 1) terraced house; 2) apartment building; 3) office building, health centre; 4) commercial building, department store, shopping centre, retail building, shopping hall, theatre, opera house, concert hall, congress hall, cinema, library, archive, museum, art gallery, exhibition hall; 5) accommodation building, hotel, dormitory, residential care home, retirement home, nursing home; 6) educational building and kindergarten; 7) sports hall; 8) hospital; and 9) storage building, transport building, swimming pool or ice rink with a net heated area of more than 1,000 square metres. The planned amendment would remove the obligation to prepare a climate report for a wide range of new buildings, including storage buildings of up to 1,000 square meters, transport buildings, swimming pools and ice rinks, and buildings undergoing major renovation. In addition, it would be clarified that extensions and additions to the floor area are excluded from the scope of the legislation.

In accordance with the already adopted Building Act, a climate report must be submitted when applying for a building permit, but in order to streamline the permit procedure, it has been proposed to amend the Building Act so that the climate report should only be submitted in connection with the final inspection.

Provisions on the preparation and content of the climate report and the method for assessing low carbon buildings will be given by a new Decree of the Ministry of the Environment.

List of materials to be replaced by a list of building products

In connection with the amendment to the Building Act, the obligation to draw up a list of materials included in the essential technical requirement for the life cycle characteristics of a building in the already adopted Building Act is to be replaced by a list of building products with a reduced scope and content.

A list of building products at least on the level of the plan for building approval should be prepared at the building permit stage for those new buildings for which a climate report should also be prepared. The list of building products would be a prerequisite for the building permit, and it would also need to be updated with respect to essential changes for the final inspection of the building. Essential changes could be caused, for example, by changes in the quantities of building products at the procurement stage.

The list of building products should contain information on the building products used in the building and on site, included in the site elements, components and internal space elements. At the final inspection stage, the updated list of building products should also include quantitative data on reused construction products, surplus construction products from elsewhere and recycled materials used to produce the construction elements included in the construction product list.

Provisions on the building product list are to be given in more detail in the same Decree of the Ministry of the Environment that provides for the climate assessment of a building.

Carbon footprint threshold also to be taken into account in many new building projects

If the Building Act is amended as planned, the requirement to comply with the carbon footprint threshold will be reduced compared to the already adopted Building Act, so that the threshold only needs be complied with in case of new buildings for which a climate report must be prepared. A climate report is prepared for the final inspection, and it is up to the building control authority to check that the threshold value calculated for the building is not exceeded.

The carbon footprint thresholds will also be provided for in more detail in a new Ministry of the Environment Decree, which is expected to be submitted for consultation in early 2025.

Our experts in the Environment, Energy & Green Transition and Real Estate Investment and Transactions teams are happy to answer any questions about the Building Act and the impact of the new regulations on construction projects. 

Latest references

We assisted eQ Community Properties Fund in the sale of two healthcare properties to a fund managed by Northern Horizon. The properties have a total floor area of approximately 3,500 square meters. The two properties are located in Espoo and Lahti. The Espoo asset was completed in 2018 and the Lahti asset was completed in 2023. Both assets are operated by Attendo, the leading care provider in the Nordic region.
Case published 9.5.2025
We advised A. Ahlström Real Estate Ltd in its acquisition of an office complex in Pasila, Helsinki, from Avain Yhtiöt Oy. The office complex is part of a new block area that will also include three tower blocks. Construction of the block has started in early 2025 and the office building is expected to be completed by the end of 2026. The office building is located in Central Pasila, in the immediate vicinity of the Tripla shopping centre, with excellent transport connections. The office will provide modern and adaptable office space for up to 450 employees. The anchor tenant in the new premises is Avain Yhtiöt. A. Ahlström Real Estate manages the real estate and forest assets of A. Ahlström Oy. Avain Yhtiöt is a Finnish housing provider specialising in developing, constructing, and managing residential properties and housing services. Under the Avain Asunnot brand, Avain Yhtiöt and Avain Asumisoikeus own over 12,000 rental, right-of-occupancy, and service housing units across Finland.
Case published 18.3.2025
We advised the real estate investor and developer Nrep in a EUR 100 million construction project in Helsinki, which combines build-to-rent housing and care homes within the one scheme. A fund managed by Nrep (NSF V) purchased the plot of land in Herttoniemi, Helsinki and subsequently secured planning consent to deliver a hybrid living scheme. The modern complex will offer high-quality housing and care facilities for the elderly alongside rental accommodation. We advised Nrep in both the purchase of the plot and the contracting of the care and housing complex. A total of 425 apartments and 108 care homes will be delivered across four buildings on the site. Construction is scheduled to begin in autumn 2025, with delivery targeted in 2028. The project will be implemented in accordance with Nrep’s principles of sustainable construction. The buildings will be equipped with solar panels, geothermal heat will be used throughout, and low-emission green concrete and steel will be used as materials. 
Case published 6.3.2025
We are assisting Verne Global Ltd, the leading provider of sustainably powered HPC data centers in the Nordics, in developing a data center in Mäntsälä, Finland. We advised Verne in acquiring the real estate company managing the Mäntsälä site, as well as in the subsequent acquisition of the site itself. Our assistance extends beyond real estate transactions to include permitting and tax-related matters. Additionally, we advise Verne on grid connection and electricity supply matters. The acquisition of the project site in Mäntsälä marks Verne’s fourth data center in Finland, reinforcing its position as a leader in sustainable and scalable data center solutions. The Mäntsälä campus, spanning 10 hectares and located just a 40-minute drive from Helsinki-Vantaa International Airport, will initially offer a capacity of 70 MW. The facility is designed to support data-intensive enterprises and AI innovators running HPC, machine learning, and other high-intensity workloads, all while operating exclusively on renewable energy. Verne’s new facility will adhere to the company’s best practice design principles, focusing on maximizing efficiency and minimizing environmental impact. The campus will be powered entirely by renewable energy sources, and waste heat generated by the data center will be utilized for local community heating projects. The company is working closely with the Mäntsälä Municipality to ensure the new facility benefits the local area, including plans to harness waste heat for district heating. Construction of Verne’s Mäntsälä data center is set to begin in mid-2025 and is expected to take two years to complete. This expansion is a strategic move in Verne’s long-term plan to build out its sustainably powered data center platform, which was acquired by Ardian, a world-leading private investment house, in early 2024. Ardian has already invested over EUR 1.6 billion in the Nordics, focusing on energy transition and digital infrastructure projects, and is working with Verne to drive sustainable growth across the region.  Read Verne Global’s press release.
Case published 20.2.2025